Cookie Consent by Free Privacy Policy website

Germany - A6, Ilshofen

Installed products

Installation time

Performance class

DELTABLOC® SB 50

April - June 2024

T3 W2

 

The DELTABLOC® SB 50 temporary safety barrier is the perfect workzone protection. This light and slim barrier enables a fast installation speed and has recently been installed over a length of 5.3km on the German A6 highway in the area of Ilshofen where the road is being modernized in the Heilbronn direction. This is state of the art workzone protection.

Go back

Get in touch
Contact us