Cookie Consent by Free Privacy Policy website

Austria - A14, Bludenz-Bürs

Installed products

Installation time

PHONOBLOC® HB Absorber CONEline

August - October 2021

 

The A14 has a total length of 61km and leads from the German border to Bludenz. As a major highway in western Austria noise protection in this densely populated area is of huge importance. Just recently PHONOBLOC® HB Absorbers have been used in a noise protection project on the A14 in the Bludenz area. Over a length of almost 500m PHONOBLOC® HB Absorbers CONEline have been installed. A super project that shows the versatile application possibilities of our PHONOBLOC® range.

Installation of PHONOBLOC® HB Absorber stone in Austria
Installation of PHONOBLOC® HB Absorber stone in Austria

Go back

Get in touch
Contact us