Romania – Bârlad bypass
Installed products |
Installation time |
Performance class |
---|---|---|
June 2024 |
H2 W3 |
We are happy to announce the first installation of our PHONOBLOC® DB NBF restraint system with integrated noise barriers in Romania, on the Bârlad bypass. This new bypass will help ease traffic in Bârlad, a town in eastern Romania. Our installed DB 80P NBF system spans 800 meters and stands 2.5 meters tall, fulfilling a H2 W3 performance class. It features PHONOBLOC® BHB noise protection panels along with steel panels.